Skip to content
QUOD Architect's company logo in white colour
  • Home
  • Profile
  • Projects
    • The Outdoor House
    • The Atlassia Showflat
    • The Trizon
    • House of Nostalgia
    • House of Symmetry
    • House of Camellia
    • Kingsmen at 313 Somerset
    • Hair Salon at Parkway Parade
    • Pro Trim Hair Salon at Compass Point
    • The Beige House
    • Dining in the Garden
    • House of Zen
    • House of Hues
    • An Aesthetics Clinic
    • Library of our times
    • Pitched House
    • Co-working space for lawyers
    The Outdoor House
    The Atlassia Showflat
    The Trizon
    House of Nostalgia
    House of Symmetry
    House of Camellia
    Kingsmen at 313 Somerset
    Hair Salon at Parkway Parade
    Pro Trim Hair Salon at Compass Point
    The Beige House
    The Family Playground
    Dining in the Garden
    House of Zen
    House of Hues
    An Aesthetics Clinic
    Library of our times
    Pitched House
  • Services
    • Architecture
    • Interior Design
    Architecture
    Interior Design
  • Resources
  • Contact Us
Read more about the article 传统采购 VS. 设计与建造

传统采购 VS. 设计与建造

  • Post author:quod
  • Post published:September 2, 2022
  • Post category:Uncategorized
  • Post comments:0 Comments

最新文章 传统采购 VS. 设计与建造 商业空间改造需要多少费用? 新加坡建房指南

Continue Reading传统采购 VS. 设计与建造
Read more about the article 商业空间改造需要多少费用

商业空间改造需要多少费用

  • Post author:quodarchitects
  • Post published:September 1, 2022
  • Post category:Uncategorized/室内设计/建筑/文章/施工/翻新/设计/资源/重建
  • Post comments:0 Comments

最新文章 传统采购 VS. 设计与建造 商业空间改造需要多少费用? 新加坡建房指南

Continue Reading商业空间改造需要多少费用
Read more about the article 新加坡建房指南

新加坡建房指南

  • Post author:quod
  • Post published:September 1, 2022
  • Post category:Uncategorized/室内设计/建筑/文章/施工/翻新/设计/资源/重建
  • Post comments:0 Comments

最新文章 传统采购 VS. 设计与建造 商业空间改造需要多少费用? 新加坡建房指南

Continue Reading新加坡建房指南
Read more about the article 有地房产设计系列——排屋

有地房产设计系列——排屋

  • Post author:quod
  • Post published:September 1, 2022
  • Post category:Uncategorized/室内设计/建筑/文章/施工/翻新/设计/资源/重建
  • Post comments:0 Comments

最新文章 传统采购 VS. 设计与建造 商业空间改造需要多少费用? 新加坡建房指南

Continue Reading有地房产设计系列——排屋
Read more about the article 新加坡有地房产设计系列——新建、重建和改建加建有什么不同?

新加坡有地房产设计系列——新建、重建和改建加建有什么不同?

  • Post author:quod
  • Post published:August 29, 2022
  • Post category:Uncategorized/室内设计/建筑/文章/施工/翻新/设计/资源/重建
  • Post comments:0 Comments

最新文章 传统采购 VS. 设计与建造 商业空间改造需要多少费用? 新加坡建房指南

Continue Reading新加坡有地房产设计系列——新建、重建和改建加建有什么不同?

Quod Architects

  • People
  • Careers
  • Privacy Policy
  • Terms of Use
  • People
  • Careers
  • Privacy Policy
  • Terms of Use

Copyright 2025© QUOD Architects | Web Design By MediaPlus Digital

SCHEMATIC DESIGN

 

At the onset of the Schematic Design Phase, the Architect would interpret the Client’s brief in terms of spatial, timeline and budgetary requirements, and present a design scheme. The design proposal would consist of proposed floor plans and 3D images, to enable the Client to visualize the space.

Upon approval of the design proposal, the Architect would make a submission to the Urban Redevelopment Authority (URA) of Singapore to obtain Provisional Permission (PP) and Written Permission (WP).

At this stage, the Architect would also work with the other Consultants (Quantity Surveyor, Structural Engineer, and Mechanical and Electrical Engineer) to prepare a preliminary estimate of the construction costs.

COMPLETION

 

Upon satisfactory completion of the construction works, the Architect will apply for Temporary Occupation Permit (TOP). With the obtainment of TOP, home-owners can then occupy the building.

The maintenance period will begin after the completion of Construction.

CONSTRUCTION

 

The Architect will take on the role of a Contract Administrator during the Construction phase. Site meetings and inspections will be held on a regular basis to keep updated on the Contractor’s progress and workmanship.

TENDER

 

During the tender documentation phase, the Architect and Consultants would prepare and finalize the Client’s requirements, necessary to obtain competitive quotations for the work.

The tender process ensures a detailed breakdown and fair comparison of costs for the client’s benefit. We invite, evaluate the tenders and award the contract on behalf of the client. Over the years, we have built good working relationships with many reputable and established builders. Selecting a trustworthy builder is critical to the success of the project.

Works can officially commence once the selected Contractor is awarded with the building contract.

DESIGN DEVELOPMENT

 

At the Design Development Phase, the Architect would develop the schematic design to a stage sufficient for the other Consultants to commence their detailed design work.

We believe that good design comprises both aspects of aesthetics and performance, as well as practicality and ease of maintenance.

SITE INVESTIGATION

 

Upon appointment of the Consultants, site investigation would need to be carried out:

  • Topography and building survey (for A&A and reconstruction works)
  • Soil Investigation

For A&A and reconstruction works involving buildings which are built before 1991, an asbestos survey would be required. We would recommend that asbestos survey to be completed before the Contractor is engaged, in order to reduce time and uncertainties during the Construction.